Company / Setec

Multidisciplinary: Engineering services, organized into specialist business units
Founded: 1957, senior staff owned
Professionals: 2,500
Turnover: 390 million US$

Services:
• Project development, Owner’s representative, Design, Construction supervision
• Project management, Specialized expertise Sectors
• Transport: metro, light to high speed rail, public transport, ITS
• Infrastructure: highways, bridges, tunnels, airports, ports
• Building: skyscraper, complex structure, conference hall, stadium, museum
• Urban planning: programming, concept/ detailed design
• Energy: bio-waste energy, nuclear civil installations
• Industry: industrial installations, complex industrial systems’ project management
• Networks, IT: studies, project management
• Sustainable development: waste to energy, water

References:
Lille Grand Stadium Half Playground Moving Platform, Toulouse Stadium, Jean Bouin Stadium Paris, Albertville Winter Olympics 1992 – France, Fondation Louis Vuitton pour la Création – Paris, Millau Viaduct, Channel Tunnel France-UK, Grand Paris Express, Eole Automatic Mass Transit – Paris, Lille Automatic Metro, Viaduct Grande Ravine – La Réunion, Floating Breakwater – Monaco Condamine Port, Toulon Underground Crossing Tunnel, Beijing Opera – China, Phare, EDF & D2 Towers – La Defense-Paris, Riyadh Metro Project, High Speed Rail all around France.

+ Info

Gilbert Aoun
Regional Manager Middle East

Phone: +974 4436 9196
Email: gilbert.aoun@setec.fr

www.setec.com